AOI equipment working environment requirements
 
1.Temperature and humidity and air pressure
 
Environment temperature, humidity and cleanliness have great impact on the performance of equipment, this section lists the requirements
Temperature and humidity operating range: 18–24°C  40–60%
Heat dissipation: 2000Kcal/hour
Air pressure supply: providing 90psiat1cfm(3kgf/cm2 at28.3liters)air pressure. Compressed air must pass water, Gas separation valve filter
 
2.Power equipments
 
This equipment is very strict in power requirement, if the power supply can not catch up , it will effect the equipment’s performance seriously.
Voltage requirements: 380V+/-10%,50Hz, Three-phase five-wire system
Distribution requirements: 20Amp dedicated power supply
The average power consumption: 2500Watts
The equipment must connect safe earth wire
 
Power supply issues:
Power must exist in no high-frequency harmonics, and provide regulated power.
Machine and its around equipments must be used only one power supply wire alone.
Around 5M machine can not exist within the power transformer and the electromagnetic signal equipment..
Each power exports must own neutral wire and earth wire.
Earth wire must connect to the factory’s “earth” contact. It is forbid to trough shell.
In the machine position’s power input, the voltage difference between the neutral wire and earth wire can not be bigger than 1v.
 
3.Environmental Rules Guidelines
The cleanliness of a room has a big effort on the performance of a equipment. So preparing a room must obey the following standards.
Export of air conditioners can not be directly in front of a equipment.
Air conditioner’s air filters must be regularly cleaned and replaced.
Get away from the factory’s corrosion source in order to avoid corrosion of equipment.
Test the ground must use solid material and shall be easy to wash , to keep clean.
Test the top of a room , pay attention to the dust particles fall.
One way to keep the room clean is to maintain the air pressure in the room is higher than the outside. That’s a way to prevent dust coming in.
 
4.computer network
when using a computer network, please distribute the network RJ45 connector on the wall of a spot. HUB, IP address, SubnetMask, and Domainname. Some suggestions are following up:
when supplying equipment power, distribution box should be located between the host and repair board sets.
The machine must be placed on a flat, solid floor.
For safety considerations, you must install the breaker to cut off the machine when necessary, and all peripheral equipment supply.
During debugging power and running the equipment, you should ensure that the fan sequence is correct (platform normally aspirated).
In the machine around (four sides) must leave at least 1 meter of space for the installation and maintenance of machines used. And install two 220VAC power outlet as the power supply maintenance services.
Do not use carpets to prevent static electricity ,damaging the equipment’s electronic components.
Room lighting system should be installed for emergency used.
Communicate to outers and phone should be installed beside the machine.


 

 

Industry standards
Knowledge base
Technical Support
 
 
 
   
Copyright © ZHEJIANG OVI TECHNOLOGY CO., LTD All rights reserved by http://www.fjjkam.cn  Tel:0577-86586661 Fax:0577-86586663
Add:2nd floor,Main Buliding,No.700,Wenzhou Avenue,Wenzhou Economic Development Zone,Zhejiang Province,China. Post Code:325011 浙ICP備09007286號(hào)-1
www.你懂的网站 | 国产第一区第一页 | 91精品人妻AⅤ一区二区 | 色哟哟在线精品入口视频怎么用 | 吞精视频大学生91 | 欧美毛茸茸在线视频 | 色色a√一级二级 | 国产又黄又爽免费观看 | 9999精品视频 | 亚洲欧美偷拍自慰 | 五月天蜜桃色丁香 | XXXX亚洲免费 | 欧美一级牲交视频 | 精品国产一区二区三区香蕉 | 耽美激情片一区二区 | 欧美大片一区二区三区 | 交换探花一69XX | 九一精品国产福利在线看 | 激情小说 91视频 | 亚洲日韩欧美日在线 | 午夜国产成人无码 | av中文天堂在线 | 黑人一区二区三区久久 | 国产美女精品人人做人人爽′‘′ | 丁香婷婷五月激情91 | 国产女人喷潮在线观看 | 欧美午夜在线视频 | 人妻中文偷情字幕 | 能看女生裸体的网站 | 阿v天堂2024 亚洲中文字幕地址 | 国产女人操逼大全 | 色婷婷在线无码精品 | 亚洲.无码.变态.欧美.中文 | 曰韩美女黄色A片 | 97成人无码免费视频 | 色色亚州日韩美女 | 亚洲AV无码乱码在线观看性色 | 亚洲碰撞免费视频网站 | 黄视频喷午夜偷偷 | 爱搞免费在线视频 | 日本免费在线一本二本 |